Laserfiche WebLink
• <br /> such tasks will be included in the report <br /> The spoil currently stored on site will be sampled & analyzed for <br /> residual levels of contamination in order that options for <br /> remediation or disposal may be evaluated We will notify the San <br /> Joaquin County EHD when a decision has been made concerning the <br /> matter <br /> We have selected a drilling contractor, MDE Corp , & have <br /> included a drilling permit application and check for $89 00 We <br /> have been informed by the contractor that a letter is on file <br /> with your department authorizing us to file the application <br /> Please let us know if that is not the case <br /> We have tentatively scheduled the work for the week of April 24 , <br /> the property owners will require a minimum of two weeks in which <br /> to clear sufficient space for the drilling rig & equipment We <br /> will final ze a start date at least 3 working days prior to <br /> mobs f z g equ pment <br /> Wter & Associates <br /> REV D WORKPLAN <br /> Apr 3 , 1995 <br /> cc Robert Fowler <br /> E�kED <br /> G' <br /> VOLLM J HUNFER <br /> Jol of <br /> NO 860 <br /> 9�OF CALM <br /> 3 <br />