My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007117
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1211
>
3500 - Local Oversight Program
>
PR0545771
>
ARCHIVED REPORTS_XR0007117
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 10:26:35 PM
Creation date
6/9/2020 2:52:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007117
RECORD_ID
PR0545771
PE
3528
FACILITY_ID
FA0009390
FACILITY_NAME
R&B AUTO REPAIR
STREET_NUMBER
1211
Direction
S
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
147-160-05
CURRENT_STATUS
02
SITE_LOCATION
1211 S TURNPIKE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the attached schematic, LAT V using either 2" or 4" OD PVC <br /> slotted and blank casing. <br /> 4. Soil samples will be transported to a State certified labora- <br /> tory with instructions to test for BTEX (EPA 8020, ) TPH-G (EPA <br /> 8015M, ) and total lead (EPA 7420. ) <br /> 5. Within 12-18 hours of completion, the well will be developed <br /> by surging and/or swabbing with a hard rubber disc or other <br /> suitable device. Purge water will be placed in properly labeled <br /> and sealed drums & stored on site pending results of laboratory <br /> analysis. <br /> B As soon as practical after development, the well will be <br /> surged, measured, and sampled according to WJH field protocol; a <br /> copy of which is included as EXHIBIT J. <br /> 7. Water samples will be transported under chain of custody to a <br /> State Certified laboratory with instructions to test for BTEX & <br /> TPH-G, using San Joaquin County approved detection limits. <br /> 8. As soon as practical after completion of the well, the <br /> elevation & surface coordinates will be determined by a licensed <br /> surveyor. <br /> 9. After receipt and analysis of all the data, a report will be <br /> prepared and submitted to the San Joaquin County EHD for review & <br /> comment. If additional work appears necessary, proposals for <br /> such tasks will be included in the report. <br /> The spoil currently stored on site will be sampled & analyzed for <br /> residual levels of contamination in order that options for <br /> remediation or disposal may be evaluated. We will notify the San <br /> Joaquin County EHD when a decision has been made concerning the <br /> matter. <br /> After receiving approval of this workplan, we will obtain bids <br /> from qualified contractors & laboratories, submit a drilling <br /> permit ap lication with appropriate fees, and schedule the work_ <br /> Wm. J unter & Associates <br /> Fe ru y 15, 1995 <br /> ce- Robert Fowler C=EQ(�C/� <br /> YILLAM 3 k.'Jia E <br /> N <br /> 5 *�9�OFC <br />
The URL can be used to link to this page
Your browser does not support the video tag.