Laserfiche WebLink
Greg Gaut <br /> Page 2 <br /> 5. It will be necessary in the future to install <br /> additio al monitoring wells to physically define the <br /> horizon al and vertical extent of the soil and <br /> groundw ter contamination. Once this has been <br /> accompl ' shed remediation alternatives can be explored <br /> and a r mediation plan can be formulated. <br /> 6. The co aminated soil (approximately one yard) that was <br /> mixed ia with the stockpiled (aerated) soil used to <br /> fill thB excavation can be addressed when the soil in <br /> the surrounding area is remediated. Blacktopping the <br /> area is approved with the understanding that further <br /> soil renediation may be required. <br /> Jogi Khanna M.D. , M.P.H. <br /> Health 0 cer <br /> Laurie A. Co 11 , REHS, Program Manager <br /> Environmental Health Division <br /> VLAC/MC: lb <br /> c: RESNA - Johr Lane <br /> 1710 Main St . <br /> Escalon, CA 95320 <br />