My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007032
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNPIKE
>
1607
>
3500 - Local Oversight Program
>
PR0545774
>
ARCHIVED REPORTS_XR0007032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 10:29:55 PM
Creation date
6/10/2020 12:20:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007032
RECORD_ID
PR0545774
PE
3526
FACILITY_ID
FA0004998
FACILITY_NAME
COMFORT AIR
STREET_NUMBER
1607
STREET_NAME
TURNPIKE
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1607 TURNPIKE RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 09 April 2002 <br /> . AGE-NC Project No 95-0141 <br /> Page 8of13 <br /> 3 7 TEMPORARY OBSERVATION WELL INSTALLATION <br /> Two temporary observation wells will be installed utilizing"direct-push"soil boring techniques The <br /> wells will be used as observation points during the proposed aquifer pumping tests The temporary <br /> wells will be located <br /> I0 Approximately 10 feet north of the proposed extraction well, and <br /> • Approximately 30 feet north of the proposed extraction well <br /> Following completion of the ground water extraction tests, the temporary wells will be backfilled <br /> to surface grade using Portland cement Procedures for advancement, installation and abandonment <br /> of the temporary wells are described in Section 4 6 <br /> 3 8 GROUND WATER EXTRACTION FEASIBILITY TESTING <br /> AGE proposes an 8-hour step draw-down pump test and a 48-hour constant rate ground water <br /> 10 <br /> extraction test to be conducted at the site to better predict a general radius of influence for ground <br /> water extraction wells and to evaluate the feasibility of ground water extraction as a remediation <br /> option Proposed extraction well EW-1 will be utilized as the extraction point during the pump tests, <br /> temporary observation wells and shallow-screened monitoring wells will be utilized as observation <br /> points The tests will be utilized to evaluate the general zones of capture (radius of influence) <br /> achievable during ground water extraction at the site and to obtain general aquifer characteristics <br /> such as hydraulic conductivity,storativity,transmissivity,and draw-down at a constant pumping rate <br /> 39 REPORT PREPARATION <br /> Following each quarterly ground water monitoring event, a quarterly report will be prepared <br /> presenting the findings The quarterly reports will include a description of work performed and the <br /> results of the soil/groundwater sampling and analysis Conclusions and recommendations will also <br /> be included in the reports, if applicable The report will be in a format acceptable to the EHD and <br /> the CRWQCB guidelines, and will be reviewed and signed by a California Registered Geologist <br /> 4.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist Procedures for CPT advancement and ground water sample collection, <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.