Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for DIAMOND GAS AND FOOD MART as of May11, 2020 . <br /> Open violations from June 04 , 2019 inspection <br /> Violation #113 - Failure to submit " Monitoring System Certification Form " within 30 days of completion of <br /> the test . <br /> Annual monitoring system certification , and leak detector testing was performed on 6/11 /18 and a test report was <br /> submitted on 10/5/18 , over two months late . A copy of the test report must be submitted within 30 days of the tests . <br /> Take all necessary precautions to ensure testing and submittal of test reports are performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #121 - Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on 6/11 /18 and an inspection report was issued identifying information to be submitted <br /> to bring this site into compliance . This information was required to be submitted by 7/11 /18 . This information has <br /> not been received resulting in a non-compliant status for this facility. An operator that receives an inspection report <br /> shall have 30 days to submit a written response that includes a statement documenting corrective actions taken or <br /> proposing corrective actions which will be taken . Ensure that a written response documenting corrective actions <br /> taken or proposed is submitted within 30 days of receiving an inspection report. <br /> The following violations are currently open : <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #123 - Failure to submit the " Spill Container Testing Report Form" within 30 days after the test. <br /> spill container testing was performed on 6/11 /18 and a test report was submitted on 10/5/18 , over two months late . <br /> A copy of the test report must be submitted within 30 days of the tests . Take all necessary precautions to ensure <br /> testing and submittal of test reports are performed in a timely manner. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 4 <br />