Laserfiche WebLink
tile, <br /> ( truck <br /> Entrance 14, 14' <br /> LLU` V D Dt 0 DP-1 + Proposed Soil Boring Locations N <br /> r0 U 530 0 MonitoringWells 2002-2003 <br /> R d s'°`"°"°^ Former ( ) <br /> Area 2 1.000 gal <br /> Office Building D Diesel usT Monitoring Wells(2004) <br /> And Scales 1696 <br /> Fortner ® Soil Borings(2002-2003) <br /> ,000 gal <br /> Gasoline UST (1=) Soil Borings(2004) <br /> 1996 <br /> Soil Borings(1994) <br /> • UST Confirmation Samples <br /> 1996 Year USTs Were Removed <br /> 16' <br /> 9.1 Sampling Depth Estimated <br /> BH-10 10' Actual Sampling Depth <br /> 41 <br /> A.phFormer <br /> O Fxcav N UST <br /> 6.5000 Property Line TPH-d <br /> O O. MW-4 <br /> rra°srom.r 011.3 Excavaeon <br /> BH-2 auwa� ® lsse-ss m9�9 <br /> 20' H-11 M 0 (10-20 feet bgs) <br /> 4.6 9.?fs <br /> BH-12 20' Former <br /> ® Former 1,000 gal 20' <br /> 28 soMy diesel UST 1140 0' <br /> Screen Mill rack\ 1e90 f �6.8 BH--115 13200 <br /> BH- DP-3 yy_ <br /> e-.�.�.a.x B -i MW-7 <br /> 20' g -138� e.r BH-16 20 <br /> T,7O0 19 tsoo <br /> ea BH-14 <br /> P T_��rs fD <br /> 800 <br /> Shop Aggregate ' Access <br /> O Buildings Base Plant 0. Bridge <br /> O 17 <br /> Former 7,000 400 <br /> gal Diesel UST <br /> 1998 <br /> 10,000 gal <br /> ATM Diesel AIT 83 <br /> Readymix `ube Shed <br /> Property <br /> 18' 0 <br /> 3 30' y Area 1 15" MW-6 <br /> L� <br /> 15*1 <br /> '09 5311 °r.St°c"plc Employee <br /> ss 3,900 D1 Breakroom <br /> e Former D1 O <br /> 10,000 gallon DP_5 DP-6 <br /> Arroyo Diesel UST Former <br /> 1996 Was Oi si°o"al° <br /> 4'and 5' <br /> 1996 NA <br /> approximate scale in feet <br /> Figure 6: Locations of Proposed Soil Borings <br /> 0 100 200 ���r •w <br />