Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of 6) <br /> V. TANK CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from section III for each Manufacturer <br /> Owens Corning AZ B ® C ❑ D ❑ <br /> A ❑ 13 El C ❑ D ❑ <br /> Test Method Used : <br /> ❑ Manufacturer Guidelines: (Specify) <br /> ® Industry Code or Engineering Standard : (Specify) PEkRP1200 <br /> ❑ Engineered Method : (Specify) <br /> Attach the testing procedures and all documentation required to determine the results. # of Attached Pages <br /> Tank Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> VI . COMMENTS <br /> Provide any additional comments here. <br /> VII . PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from section III for each Manufacturer <br /> AO Smith A ® B ® C ❑ D ❑ <br /> A ❑ B ❑ C ❑ D ❑ <br /> Test Method Used : <br /> ❑ Manufacturer Guidelines: (Specify) <br /> ® Industry Code or Engineering Standard : (Specify) PEI - RP1200 <br /> ❑ Engineered Method : (Specify) <br /> Attach the testing procedures and all documentation required to determine the results. # of Attached Pages <br /> Product Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> VIII . COMMENTS <br /> Provide any additional comments here. <br /> • Tank 87 Secondary Piping Run failed the pressure test due to a bad test boot into the <br /> STP Sump . Boot must be replaced and piping run retested with passing result . <br /> • Tank 91 Secondary Piping Run failed the pressure test due to a bad bottom penetration <br /> fitting into Dispenser 5 - 6 . Fitting must be repaired/replaced and piping run retested <br /> with passing result . <br /> ID = Identification <br />