My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:16 PM
Creation date
6/11/2020 3:03:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of s) <br />XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />A❑ <br />B❑ <br />I C❑ <br />D❑ <br />A❑ <br />B❑ <br />I C❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br /># of Attached Pages <br />Attach the testing procedures and all documentation required to determine the results. <br />Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />Interstitial Communication Verification Method Used: <br />NA -Section III -No Vapor Recovery Piping Containment at this UST Facility. <br />XIV. COMMENTS <br />Provide any additional comments here. <br />NA -Section III -No Vapor Recovery Piping Containment at this UST Facility. <br />XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br />Manufacturer Identify Tank ID from Section III for each Manufacturer <br />Unknown Fiberglass A ❑x <br />I B ❑x <br />1 C ❑x <br />D ❑ <br />A❑ <br />I B❑ <br />I C❑ <br />I D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />p Engineered Method (Specify): Caldwell Systems/Hydrostatic 30 Minutes <br /># of Attached Pages <br />Attach the testing procedures and all documentation required to determine the results. 2 <br />Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />Caldwell Level Change Indicator <br />7/5/2020 <br />ICC Service Technician #5246802 -UT <br />3/21/2021 <br />Underground Storage Tank Tester License #90-1120 <br />12/31/2022 <br />XVI. COMMENTS <br />Provide any additional comments here. <br />ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.