Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page s of 6) <br />XVII. FILL RISER SUMP TESTING INFORMATION <br />Manufacturer Identi Tank ID from Section III for each Manufacturer <br />Unknown Fiberglass A x❑ <br />B D <br />C 0D❑ <br />A❑ <br />B <br />C❑E:�D❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />0 Engineered Method (Specify): Caldwell Systems/Hydrostatic 30 Minutes <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages2 <br />Fill Riser Sump Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />Caldwell Level Change Indicator <br />7/5/2020 <br />ICC Service Technician #5246802 -UT <br />3/21/2021 <br />Underground Storage Tank Tester License #90-1120 <br />12/31/2022 <br />XVIII. COMMENTS <br />Provide any additional comments here. <br />XIX. VENT / TRANSITION SUMP TESTING INFORMATION <br />Manufacturer Identify Vent / Transition Sump ID from Section III for each Manufacturer <br />a❑ <br />I b❑ <br />c❑ <br />a <br />d <br />a❑ <br />I b❑ I <br />c❑ <br />I d❑ <br />Test Method Used: <br />❑ Manufacturer Guidelines (Specify): <br />❑ Industry Code or Engineering Standard (Specify): <br />❑ Engineered Method (Specify): <br />Attach the testing procedures and all documentation required to determine the results. <br /># of Attached Pages <br />Vent / Transition Sump Testing Training and Certifications (List applicable certifications.) <br />Expiration Date <br />XX. COMMENTS <br />Provide any additional comments here. <br />NA -Section III -No Vent/Transition Sump at this UST Facility. <br />ID = Identification <br />