Laserfiche WebLink
2. SECONDARY LINES/PIPING TESTING <br /> Company Name: B.Z. Service Station Maintenance <br /> Company Address: 1041 Triangle Ct., West Sacramento,CA 95605 _ <br /> Credentials: ® CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: ICC License Number: 433159 <br /> Product Lines ❑ Vent Lines ❑ Vapor Lines ❑ <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution:0.5 PSI <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Test Start Time: <br /> Initial Reading(Rr): PSI PSI PSI PSI <br /> Test End Time: 7 <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: I HR 1 HR I HR 1 HR <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ❑ Pass El Fail El Pass ❑ Fail El Pass ❑ Fail ❑ Pass E] Fail <br /> Product Lines ❑ Vent Lincs ❑ Vapor Lines ❑ <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution:0.5 PSI <br /> Piping 11m # Piping; Run # Pipilig Run# Piping Run# <br /> Test Start Time: <br /> Initial Reading(Rr): PSI PSI PSI PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: I HR 1 HR 1 HR 1 HR <br /> Change in Reading(RF-Ri): _ <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: i I — <br /> Test Result: [] Pass [] Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑Pass ❑ Fail <br /> Product Lines ❑ Vent Lines ❑ Vapor Lines ❑ <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: 0.5 PSI — <br /> Piping Run # Piping; Run# Piping Run# Piping Run # <br /> Test Start Time: <br /> Initial Reading(Ri): I'SI PSI PSI PSI <br /> "fest End Time: <br /> Final Reading(RF): PSI PSI PSI _ Ills] <br /> Test Duration: 1 HR 1 HR 1 HR _ I HR l <br /> Change in Reading(RF-R,): -- <br /> Pass/Fail Threshold or l� 0 0 0 <br /> Criteria: <br /> Test Result: [—fol ❑ Fail ❑ Pass ❑ Fail 0 Pass 0Fail ❑ Pass ❑ Fail <br />