Laserfiche WebLink
RECEIVED <br /> Product Lines ❑ Vent Lines ❑ Vapor Lines ❑ SEP 0 4 2020 <br /> Test Equipment Used: PRESSURE GAUGE Equi¢iail�iltlE� 3o+�Np(r _� <br /> I_ <br /> Piping Run # Piping Run # Piping Run# riping, kun# <br /> Test Start Time: <br /> Initial Reading(R,): PSI PSI PSI PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: 1 HR 1 HR I HR 1 HR <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: __ <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail El Pass El Fail <br /> Product Lines ❑ Vent Lines ❑ Vapor Lines ❑ <br /> Test Equipment Used: PRESSURE GAUGE Equipment Resolution: 0.5 PSI <br /> Piping Run# Piping Run # Piping Run # Piping Run # <br /> Test Start Time: <br /> Initial Reading(Rt): PSI PSI PSI PSI <br /> Test End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Test Duration: 1 HR 1 HR 1 HR 1 HR <br /> Change in Reading(RF-R,): __- <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail El Pass ❑ Fail 1 El Pass El Fail ❑ Pass ❑ Fail <br /> Product Lines ❑ Vent Lines ❑ Vapor Lines ❑ <br /> Test Equipment Used: PRESSURE.GAUGE Equipment Resolution:0.5 PSI <br /> Piping Run# Piping Run # Piping Run# Piping Run# <br /> Test Start Time: — <br /> Initial Reading(Rj): PSI PSI PSI PSI <br /> 'fest End Time: <br /> Final Reading(RF): PSI PSI PSI PSI <br /> Fest Duration: I HR 1 HR I HR I HR <br /> Change in Reading(RF-Rj): _ <br /> Pass/Fail Threshold or 0 11 0 0 <br /> Criteria: __ <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fuil Pass E] Fail <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> N/A <br />