My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:13:51 PM
Creation date
6/11/2020 5:00:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br /> Bend the three warning plate ears down then slide the <br /> tie wrap over the warning plate ears and position warn- <br /> ing plate against riser pipe approximately 1"below the <br /> adaptor. Tighten the tie wrap securely. The valve is <br /> now fully installed and in operating position. <br /> Q <br /> NOTE: the warning plate includes important warn- <br /> ings,operating parameters,and listing information <br /> and must be installed. 'lam A' <br /> v <br /> Manufacturer:"DPW" <br /> Model:071 SO-4" <br /> (4"represents size) <br /> Manufacture Date: <br /> "Ml"G MMYY" <br /> MM=Month YY=Year <br /> Wamrng <br /> Figure 26-Product Identification <br /> Figure 25 <br /> STEP 26: VALVE REMOVAL <br /> The valve can be removed for tank leak testing,inspec- <br /> tion,etc.,by removing the Rotatable Product Adaptor, <br /> the 4"nipple,and the Jack Screw Kit, Reinstall per the <br /> above instructions. <br /> For testable models only: It is not necessary to re- <br /> move the valve to check poppet movement 1 function. <br /> See Page 17 for full testing details. <br /> STEP 27: ELECTRONIC LIQUID LEVEL MONITORING <br /> If an electronic level monitor is installed,it must be cali- <br /> brated to match the top of the 7150 valve body,which <br /> must correlate with 95%of the actual tank capacity, <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.