My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:13:51 PM
Creation date
6/11/2020 5:00:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> 71 SO Overfill Valve Upper Tube Calculation Worksheet <br /> Important This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in Inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take Into account other considerations such as extreme tank tilt. <br /> Desired tank capacity for shut-off; 50%= <br /> Dipstick Number on Tank Chart that corresponds to 100%volume(Y) (y) <br /> Dipstick Number on Tank Chart that corresponds to SO%{X}_ � 0 (x) <br /> Upper Tube Reference Number Z=Y-X (2) <br /> Upper Tube Depth Inside Tank C=Z-2'. <br /> Distance from top sealing surface for 71 SD Up'to inside the 0 (C) <br /> top of Storage Tank' A= <br /> For Non-testable 71 SO rnodeis gnly <br /> In all cases for non-testable 71 SO models,the top of the valve body must protrude at least d'h"into the tank to <br /> provide a minimal clearance for proper operation.3 Additionally the total Lipper Tube Length must beat least 16" <br /> of length to include the protective bend in the tube. <br /> Is C less than 51/2" Yes 1 No <br /> If NO,Upper Tube Length(D)=C+A <br /> If YES,Upper Tube Length(D)=6112"+A <br /> Upper Tube Length <br /> For Testabig 7150 ragdels <br /> In all cases for Testable 7150 models,the top of the valve body must protrude at least 6'12"into the tank to provide <br /> a minimal clearance for proper operation.3 Additionally the total Upper Tube Length must beat least 141/2"of <br /> length to include the protective bend in the tube. <br /> Is C less than 5" Yes / No <br /> If NO,Upper Tube Length(D)=C+A- 1 '/z" <br /> If YES,Upper Tube Length(D)=6'/z"+A-- 1 '/z" <br /> Upper Tube Length= <br /> ' Sealing surface may be the top of the Face Seal Adaptor,the buil€in sealing ledge inside some spill containers,or on non-vapor <br /> tight applications the top of the pipe nipple <br /> 2 Some Underground Storage tanks utilize a manway system of the tap. Make sure to use the top of the storage tank farmeasure- <br /> ment and not to top of the manway. Consuityour underground tank manufacturer for height of the manway <br /> -1 This measurement is taken from the seam where the upper tube is attached to the valve body to the Inside of the tank top, <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.