My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4344
>
2300 - Underground Storage Tank Program
>
PR0231766
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 1:13:51 PM
Creation date
6/11/2020 5:00:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231766
PE
2361
FACILITY_ID
FA0003717
FACILITY_NAME
CHEVRON STATION #99840*
STREET_NUMBER
4344
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
Rd
City
Stockton
Zip
95215
APN
10102156
CURRENT_STATUS
01
SITE_LOCATION
4344 E Waterloo Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix 8 <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Impgrtant: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Haying Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take Into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- P <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast J; <br /> lug in the 71 SO body(see figures),upper tube length. 'I <br /> Note: the Upper Tube Length must be at least 16"to <br /> include the protective bend in the tube. <br /> (D)= <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. (�) <br /> (W)_ <br /> (V)= Upper <br /> Tube <br /> Distance from the 71 SO inlet tube flange to the bottom _. <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension y <br /> (DPW 6111 &61 TP models add 0.6') (W)Valve <br /> (g)_ Length, <br /> bottom of <br /> From the tank calibration chart provided bytank manta- cut <br /> facturerfind the dipstick number(Y)which corresponds <br /> to the 100%volume. (8) <br /> (Y) To Tank <br /> 1. To determine shut-off{percentage: <br /> Tank <br /> Subtract upper tube length(D)from distance to tank (U)Valve Chart <br /> bottom(B) Length, 100%Vol- 1 <br /> (x)=(B)..(D)-2"- top of cut ume Dip- <br /> srick <br /> Using the tank calibration chart provided by the tank �' <br /> manufacturer determine the tank capacity at the cal- <br /> culated(1C)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= <br /> (Y)tank capacity in gallons w -- - <br /> SO%_(X)capacity!(Y)capacity x1 AQ= <br /> Note: The overfill valve must be installed per AN require- <br /> ments and all applicable local,state,and national codes. if <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves shoWd be Set to a maximurn of 9594. <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.