My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
20913
>
2900 - Site Mitigation Program
>
PR0545720
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/12/2020 11:34:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545720
PE
2952
FACILITY_ID
FA0005524
FACILITY_NAME
A TEICHERT & SON INC
STREET_NUMBER
20913
Direction
E
STREET_NAME
STATE ROUTE 12
City
CLEMENTS
Zip
95812
CURRENT_STATUS
02
SITE_LOCATION
20913 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br /> H. COMMUNICATION PROCEDURES <br /> Personnel in the Exclusion Zone- and work area should remain in <br /> constant voice contact or within sight of other employees . <br /> Three Horn Blast is the emergency signal to indicate that all <br /> personnel should leave the work site. In addition, a loud hailer <br /> is available if required. <br /> The following'' standard hand signals will be used: <br /> „ <br /> Hand gripping throat----------------Out of air, can ' t breathe <br /> Grip partner ' s wrist or both hands <br /> around; waist------=-------=-------Leave area immediately 1 <br /> Hands on;� top of head----------------Need assistance <br /> Thumbs up----------------------------OK, I 'm alright, <br /> I understand <br /> Thumbs down------------------------No, negative <br /> Telephone communication should be established as soon . as <br /> practical. <br /> I . DECONTAMINATION PROCEDURES <br /> Personnel and equipment leaving the. job site shall be thoroughly <br /> decontaminated. The standard level of decontamination is washing <br /> with soap an& water . <br /> Emergency decontamination will include the following stations : <br /> Washing with soap and water, removal of clothing. <br /> The following decontamination equipment is required: Soap and <br /> water at job site, eye wash .equipment. <br /> J. SITE SAFETY AND HEALTH PLAN <br /> 1. Project 'Foreman is the designated Site Safety Office and is <br /> directly' responsible for safety recommendations on site. <br /> 2 . Emergency Medical Care <br /> Project Foreman is the qualified EMT on site . <br /> Nick Chronis at 3525 52nd Avenue, Sacramento, <br /> California, phone .(916) 421-1990, is located 50 minutes <br /> from this location. <br /> Local ambulance service ,is available from County at <br /> phone 911 . Their response time is 10-15 minutes. <br /> PAGE 4 OF 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.