My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
FIELD DOCUMENTS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:16:33 AM
Creation date
6/15/2020 11:08:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 1
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> KL:rEINEELDER <br /> I =CUTIVR SUMMARY <br /> Kleinfelder has prepared the following work plan for the remediation of <br /> diesel—contaminated soil at the A &T microwave site at 157 West� Turner <br /> Avenue, Lodi, California. Kleinfelder intends to coordinate and :conduct <br /> the soil remediation in accordance with the Central Valley Regional Water <br /> Quality Control Board (RWQCB), San 'Joaquin Local Health District ('!SJLHD), <br /> and San Joaquin Air Pollution Control, District (APCD) guidelines. <br /> The purpose of this work plan is to .provide a document that describes the <br /> transportation, aeration, and disposition of 'contaminated ,! soil.. <br /> Additional requirements, directives, and amendments can .be discus'sed and <br /> incorporated into this work plan such that the soil remediation can <br /> proceed in a timely and cost--effective 'manner. <br /> Remediation of the soil will complete the tank removal and site <br /> restoration. <br /> i <br /> :i <br /> t <br /> E <br /> I <br /> E <br /> �1 - <br /> E <br /> E <br /> E <br /> 59-87-679 1 <br /> E <br /> i <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.