Laserfiche WebLink
r. ,. <br /> 5.4 WORK ZONES AND DECONTAMINATION PROCEDURES: <br /> " Work zones will be established in accordance with guidance provided <br /> in Figure 5-1. These zones may be modified to fit applicable field <br /> conditions; however, proposed modifications must be approved by the <br /> Project Manager and Site Safety Officer prior to being implemented <br /> in the field. <br /> Personnel decontamination will be initiated on site. Disposable <br /> M clothing will be removed and stored in designated containers. If <br /> additional decontamination is necessary, based on preliminary or <br /> subsequent risk assessment by the Site Safety Officer in <br /> consultation with ESE Corporate Safety and Health officer, <br /> additional decontamination procedures will be implemented. Site <br /> specific decontamination procedures will be listed in the Site- <br /> Specific Plan. <br /> All heavy equipment will be decontaminated on site. Water in the <br /> form of steam cleaning and/or pressure washing may be used to <br /> remove any visual contamination from drilling equipment and <br /> backhoe. <br /> 5.5 SITE SECURITY AND ENTRY: <br /> Site security measures, including barricading, fencing, and <br /> lighting, and any special site entry procedures will be described <br /> in the Section 5 of the Site--Specific Pian. <br /> 14 <br /> 1 <br />