My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012716
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
90
>
2900 - Site Mitigation Program
>
PR0545765
>
ARCHIVED REPORTS_XR0012716
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:24:21 AM
Creation date
6/15/2020 11:11:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012716
RECORD_ID
PR0545765
PE
3528
FACILITY_ID
FA0003657
FACILITY_NAME
AT&T Corp. - UE231
STREET_NUMBER
90
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
CURRENT_STATUS
02
SITE_LOCATION
90 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. ,. <br /> 5.4 WORK ZONES AND DECONTAMINATION PROCEDURES: <br /> " Work zones will be established in accordance with guidance provided <br /> in Figure 5-1. These zones may be modified to fit applicable field <br /> conditions; however, proposed modifications must be approved by the <br /> Project Manager and Site Safety Officer prior to being implemented <br /> in the field. <br /> Personnel decontamination will be initiated on site. Disposable <br /> M clothing will be removed and stored in designated containers. If <br /> additional decontamination is necessary, based on preliminary or <br /> subsequent risk assessment by the Site Safety Officer in <br /> consultation with ESE Corporate Safety and Health officer, <br /> additional decontamination procedures will be implemented. Site <br /> specific decontamination procedures will be listed in the Site- <br /> Specific Plan. <br /> All heavy equipment will be decontaminated on site. Water in the <br /> form of steam cleaning and/or pressure washing may be used to <br /> remove any visual contamination from drilling equipment and <br /> backhoe. <br /> 5.5 SITE SECURITY AND ENTRY: <br /> Site security measures, including barricading, fencing, and <br /> lighting, and any special site entry procedures will be described <br /> in the Section 5 of the Site--Specific Pian. <br /> 14 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.