Laserfiche WebLink
,S <br /> Ground Zero Analysts, Inc. t <br /> SITE SAFETY PLAN <br /> F. k <br /> f <br /> Job Name: Western Building Materials - <br /> Job Location: 733 South Van Buren St Stockton <br /> Client Name: Western Buildin2 Materials <br /> Project Number: 97-210 Date: 12/12/97 <br /> General. Work Description: Advance up to four soil borings <br /> SSP Prepared by: Jeanne Buckthal <br /> On-site Safety Officer: _ Janne Buckthal <br /> Project Safety Officer: John Lane <br /> This site safety and health plan (SSP) must be kept on-site.'and accessible to all on-site <br /> employees during all phases of site operations. The SSP must be '`reviewed and signed by all on- <br /> site employees, subcontractors, and visitors:prior to entering the site. <br /> The provisions set-forth in this SSP shall apply to GZA employees and any subcontractors <br /> working for GZA at the job site. All personnel working for GZA at the job site must read this <br /> SSP, and sign the attached Compliance Agreement before entering the work area. Field <br /> personnel may deviate from the safety provisions set-forth:.in this SSP, but only to upgrade or <br /> increase the safety requirements. GZA personnel may suspend work if unsafe working <br /> conditions are identified or observed, or unauthorized modifications to the safety provisions set- <br /> forth in this SSP are made. If changes in site or working conditions require changes in safety <br /> procedures, appropriate amendments to this SSP will be provided by the GZA project manager <br /> or supervisor, with the written approval of the GZA Health and-Safety Safety Director. <br /> Page l <br />