Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> `.Tasklsl .... Hazard :< <br /> lit fgata <br /> n Measure <br /> 1 Heavy Equipment (Noise & Physical All heavy equipment used on this <br /> i project will be, <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA'Title 8, Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone`applies to all personnel. The. <br /> exclusion zone;will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> i <br /> any time. <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> Dust The dust hazard will be mitigated',by not <br /> allowing ground crew to be located down wind <br /> of drilling and 'excavation activity, In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> _, <br /> i�$rtamable 11�I sh I�Qint c 1'OO °F;I Combustible t las Point ....1 <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show, on map for large projects) <br /> Dry chemical fire extinguishers. Class A. B, and C, are stored in all_GZA vehicles. <br /> Page 4 <br />