My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAN BUREN
>
733
>
3500 - Local Oversight Program
>
PR0545787
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 11:46:22 AM
Creation date
6/15/2020 11:19:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0545787
PE
3528
FACILITY_ID
FA0009091
FACILITY_NAME
MASONITE CORPORATION
STREET_NUMBER
733
Direction
S
STREET_NAME
VAN BUREN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14711010
CURRENT_STATUS
02
SITE_LOCATION
733 S VAN BUREN ST
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M � Ief <br /> I <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN f <br /> f <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on-all GZA worksites. Level D includes: ; <br /> ✓ Steel toed boots <br /> f� <br /> ✓ Safety Glasses <br /> or Hard Hat <br /> For each task on this project, identify additional protective garments as,required, include the conditions <br /> under which the level of PPE would be modified for each task. <br /> i <br /> Tasklsi` .. . ..,..::.Condition... :..... . t'ersonnel.'.. .... : ... Gartlerlt{s1 <br /> 1 Working Near Vehicle Orange Vests <br /> X20 ppm for 5 minutes 1/2 Face Respirator <br /> >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> k <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GL4 hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> Work zone. <br /> MARK WORK ZONES ON SITE MAP ❑ CHECK WHEN DONE. <br /> Page 7 <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.