Laserfiche WebLink
M � Ief <br /> I <br /> Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN f <br /> f <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum Level D protection is required on-all GZA worksites. Level D includes: ; <br /> ✓ Steel toed boots <br /> f� <br /> ✓ Safety Glasses <br /> or Hard Hat <br /> For each task on this project, identify additional protective garments as,required, include the conditions <br /> under which the level of PPE would be modified for each task. <br /> i <br /> Tasklsi` .. . ..,..::.Condition... :..... . t'ersonnel.'.. .... : ... Gartlerlt{s1 <br /> 1 Working Near Vehicle Orange Vests <br /> X20 ppm for 5 minutes 1/2 Face Respirator <br /> >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> k <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GL4 hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> Work zone. <br /> MARK WORK ZONES ON SITE MAP ❑ CHECK WHEN DONE. <br /> Page 7 <br /> f <br />