Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> On-site communications: ❑ Radio ® Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio ® Telephone <br /> i <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities.- <br /> MARK EVACUATION ROUTE(S) ON SITE MAP ❑ CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated versonal protective a ui went: i.e: <br /> saloves, coveralls) will be placed on and covered with 6-mil plastic sheetinsa along with the drill cuttings. <br /> Location of Wash Water. At building onsite <br /> Location of Toilet. At buildinca onsite <br /> E <br /> Location of Drinking Water. At buildina onsite <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP ❑ CHECK WHEN DONE <br /> Equipment Decontamination Procedure: Eguipment will be washed and/or <br /> steamcleaned.^ <br /> Materials to be Disposed.of as Hazardous Waste: All soil and vvater produced will be stored <br /> onsite until appropriate disposal methods are <br /> determined. ' <br /> Page 8 <br />