Farmington Groundwater Recharge Program STC Work Plan—Kautz Site <br /> recorded on the Groundwater Level Forms (Appendix F) according to the schedule presented in <br /> Appendix D. <br /> Figure 4 Monitoring Well Construction Diagram <br /> STANDPIPE SURFACE <br /> COMPLETION <br /> WELL CASING COMPLETED <br /> 2.5'ABOVE GROUND SURFACE <br /> 0 <br /> o A <br /> u n I e c <br /> D <br /> •A c. <br /> 'D D <br /> A <br /> dr, <br /> 20 <br /> ♦A <br /> A O A <br /> TYPE I/IIN PORTLAND CEMENT a I D <br /> •< n <br /> BLANK CASING <br /> 2'INNER DIAMETER <br /> •'D <br /> A <br /> 40 <br /> D t , <br /> A • I .a♦ <br /> D <br /> 60 <br /> . c <br /> a <br /> A I • D <br /> a •c <br /> ggqqqq D A <br /> D <br /> D A D <br /> t4 <br /> ' A f4 or <br /> A •D <br /> D <br /> D ' D TOP OF FINE SAND LAYER <br /> BOTTOM OF FINE SAND LAYER <br /> WELL SCREEN k TOP OF SCREEN INTERVAL 80 <br /> r 9 2'INNER DIAMETER <br /> — STATIC WATER LEVEL <br /> FILTER PACK MATERIAL <br /> •d <br /> 100 <br /> BASE CAP: f BOTTOM OF SCREEN <br /> 2'INNER DIAMETER — BASE OF WELL <br /> 3 BOTTOM OF REAMED HOLE <br /> 9 <br /> k <br /> 120 <br /> d <br /> MWH 2-7 October 2004 <br />