Laserfiche WebLink
Farmington Groundwater Recharge Program STC Work Plan—Kautz Site <br /> recorded on the Groundwater Level Forms (Appendix F) according to the schedule presented in <br /> Appendix D. <br /> Figure 4 Monitoring Well Construction Diagram <br /> STANDPIPE SURFACE <br /> COMPLETION <br /> WELL CASING COMPLETED <br /> 2.5'ABOVE GROUND SURFACE <br /> 0 <br /> an <br /> 20 <br /> o ' <br /> TYPE 1/II/V PORTLAND CEMENT <br /> BLANK CASING , <br /> e <br /> 2"C 6'C !1�J , <br /> m I 40 <br /> ^ • D <br /> I <br /> 60 <br /> D • D <br /> — TOP OF FINE SAND LAYER <br /> BOTTOM OF FINE SAND LAYER <br /> WELL SCREEN ; TOP OF SCREEN INTERVAL 80 <br /> STATIC WATER LEVEL <br /> CAST to <br /> FILTER PACK MATERIAL <br /> 100 <br /> BASE CAP: {' f BOTTOM OF SCREEN <br /> 2-INNEfi'BMdft-TEF- — BASE OF WELL <br /> CIQS%/JZ4 BOTTOM OF REAMED HOLE <br /> :J e- <br /> 120 <br /> MWH 2-7 October 2004 <br />