Laserfiche WebLink
i <br /> Farmington Groundwater Recharge Program STC Work Plan—Hammer Site <br /> Irecorded on the Groundwater Elevation collection forms (Appendix F) according to the schedule <br /> I presented in Appendix D. <br /> Figure 4 Monitoring Well Construction Diagram <br /> I STANDPIPE SURFACE <br /> COMPLETION <br /> WELL CASING COMPLETED <br /> 0.5'ABOVE GROUND SURFACE <br /> I 0 <br /> I < I `D <br /> I o <br /> I -•c•. , .D ,c <br /> ° 20 <br /> I TYPE I/II,N PORTLAND CEMENT D <br /> •e <br /> n <br /> BLANK CASING <br /> 24-N4E4 i-BhA#E`TE R <br /> 40 <br /> e i ••D <br /> n 60 <br /> • C <br /> e I • > <br /> •° c <br /> .�D C •D <br /> • •> I Ie' <br /> � > °•D TOP OF FINE SAND LAYER <br /> BOTTOM OF FINE SAND LAYER <br /> WELL SCREEN TOP OF SCREEN INTERVAL 80 <br /> ' CAS/Nf� STATIC WATER LEVEL <br /> FILTER PACK MATERIAL <br /> Ni` c <br /> 100 <br /> SUMP: f BOT70M OF SCREEN <br /> 2.ONI�TE — BOTTOM OF SUMP <br /> C(�S�ti1� BOTTOM OF REAMED HOLE <br /> 8.. <br /> 120 <br /> MWH 2-7 October 2004 <br />