Laserfiche WebLink
Farmington Groundwater Recharge Program STC Work Plan—Kautz Site <br /> recorded on the Groundwater Elevation collection forms (Appendix F) according to the schedule <br /> presented in Appendix D. <br /> Figure 4 Monitoring Well Construction Diagram <br /> STANDPIPE SURFACE <br /> COMPLETION <br /> WELL CASING COMPLETED <br /> 0.5'ABOVE GROUND SURFACE <br /> 1 0 <br /> q P , <br /> a• o I a q <br /> 4 P <br /> D <br /> a I ; <br /> •Q i .e <br /> P P <br /> ;.• > I D 20 <br /> •A <br /> P •q ' P <br /> TYPE I/II/V PORTLAND CEMENT <br /> ♦ D •q. <br /> •e ' P <br /> P I • <br /> BLANK CASING ° <br /> 2.5"INNER DIAMETER q <br /> P ( D <br /> Y <br /> • 1 P <br /> C9 C 40 <br /> q I •D <br /> .q <br /> P <br /> D ' • <br /> P a... <br /> • D q` <br /> .`q I • <br /> P • Y <br /> D <br /> q • - a♦ <br /> a I q 60 <br /> C <br /> ♦ C <br /> q I •♦ Y <br /> D ,d. <br /> P <br /> •D <br /> P 1 <br /> DD P'•D <br /> to <br /> �q I ♦D <br /> P <br /> P•`> I P°° TOP OF FINE SAND LAYER <br /> BOTTOM OF FINE SAND LAYER <br /> WELL SCREEN ° — TOP OF SCREEN INTERVAL 80 <br /> 2.5"INNER DIAMETER <br /> — STATIC WATER LEVEL <br /> FILTER PACK MATERIAL <br /> 100 <br /> SUMP: J- BOTTOM OF SCREEN <br /> 2.5"INNER DIAMETER — BOTTOM OF SUMP <br /> BOTTOM OF REAMED HOLE <br /> S" <br /> 120 <br /> MWH 2-7 July 2004 <br />