Laserfiche WebLink
Mr. Kenneth Olds <br /> January 25, 1989 <br /> 202/029000--301 <br /> Page 2 <br /> " Submit water samples to an analytical laboratory for <br /> analyses of BTEX, and TPH as gasoline and diesel <br /> concentrations . <br /> " The hydrogeologic and chemical data would be used to <br /> prepare a Problem Assessment Report . <br /> GTT believes that the proposed work steps would cost-effectively <br /> provide the information necessary to proceed to the final <br /> remediation phase of the investigation as required by the CRWQCB- <br /> CVR. <br /> The following breakdown reflects the anticipated costs for <br /> Implementation of the proposed work steps. <br /> WORK STEPS ESTIMATED COST <br /> Drilling and installation of three <br /> monitoring wells $ 4 , 400 . 00 <br /> Well surveying, monitoring, purging/ <br /> development , sampling $ 1 , 040 . 00 <br /> Laboratory analyses of soil and water <br /> samples $ 1 , 880 . 00 <br /> Problem Assessment Report $ 2, 800 . 00 <br /> Project organization, QA/QC, site <br /> safety $ 1 , 600 . 00 <br /> TOTAL ESTIMATED COST $11 ,820.00 <br /> GTI would provide the proposed services on a time and materials <br /> basis for a maximum fee of $ 11 , 820 . 0 , which would not be <br /> exceeded without prior authorization oy Mr . Olds . Services would <br /> be billed in accordance with the encl sed Professional Rate <br /> Schedule . The above cost estimate does not include containment <br /> and/or disposal of contaminated soil and groundwater-, and/or <br /> permitting fees associated with the project (which would be <br /> billed at their actual cost ) . <br /> During the drilling operations , GTI would make every reasonable <br /> effort to avoid underground utilities or improvements at the <br /> site . However, GTI will not be responsible for damage to any <br />