Laserfiche WebLink
z <br /> r <br /> yl <br /> 1-J <br /> 2021899-7004 <br /> Larrtmt:rsville School District <br /> b <br /> July 16, 1990 <br /> _ <br /> were placed in Hansen Road to <br /> underground utilities, Traffic cones, warning signs, and caution tape, <br /> protect passersby, and to divert traffic lrom the work area during drill'ng operations. <br /> 5.2 DRILLING 19, gto assess the <br /> Three soil boringslrnonitoring wells were drilled at tha site f on <br /> the re easeof gasoline. The <br /> horizontal and vertical extent of petroleum hydrocarbons resulting <br /> the previous investlgatian. <br /> numerical designation of the borings/wells follows that from <br /> ings <br /> The new borings are located immediately east of the subject site along third(MW-8)R ond;two <br /> bcrast side <br /> (MW-6 and MW-7)are located on the west side of Hansen Road,ar' <br /> of the road. During drilling operations a photo;onization detector(PID) was used to lieandrMw )were <br /> samples for hydrocarbon concentrations. Threc 2-inch monitoring wells(MW 6,MW-7, <br /> undwater sampling points. Figure 2 depicts the locations of <br /> constructed;n those t orings to provide gro <br /> the soil borings/monitoring Neils. <br /> 5.3 SOIL BORINGS with 8-inch outside diameter <br /> The soil borings were drilled with struck-mounted drill riequipped ya field geologist working under <br /> (O.D.),steam-cleaned,hollow-stem augers. The dr 1.+ng was supervisedtered while <br /> uous log of <br /> rials encoun <br /> the direction of a State of callfo'nia registered geologist. '�Apnso I generated during the drilling Aeration <br /> drilling was completed by the field geologist{Appendix 11). <br /> a roved containers pending results of <br /> was stored on site in Department of Transportation {DOT) Pp s and all soil <br /> laboratory analyses. All downhole drilling equipment was steam cleaned between baring <br /> e quiment was steam cleaned between sampling runs <br /> to prevent crossoceacontatner�sand <br /> sampling g P ed into DOT-appy <br /> rinseate ger-,..-led during the steam cleaning operations were pump <br /> stored on site pending laboratory ana,ysis of the soil samples, <br /> 5.4 SOIL SAMPLING the <br /> Soil samples were collected from the soil borings at 5-foot ce. Say; rtes weretcollected during <br /> borings(20 feet),beginning at approximately 5 feet below ground slue alined with three 2 inch diameter by <br /> drilling usi tg a 2.5-inch O.D.modified California split-spoon same <br /> 6 inch long brass saield screening tools <br /> mple tubes. Odor,discoloration of soil,and a P D h ries were ssed as fubsequently sealed <br /> to wisess the presence of petroleum hydrocarbons;n the soil P <br /> ---------- ------... laced-.on_ice an insulated cooler. Based on PID screeningand visual _----- ------- <br /> and p <br /> --.. <br /> TECHNOLOGY-INC. <br />