My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2130
>
2900 - Site Mitigation Program
>
PR0008999
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 3:18:50 PM
Creation date
6/15/2020 2:59:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0008999
PE
2960
FACILITY_ID
FA0004519
FACILITY_NAME
UNOCAL/CERT
STREET_NUMBER
2130
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2130 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra-Pacific Gro rr"['_at;'a3_-f �Gltants, Inc. <br /> H�ISQGEOLOGISTS & GEOLOGISTS <br /> 93 OCT 12 PH 2: Q9 <br /> 8 October 1993 <br /> Ms. Wendy Wyels, Agricultural Regulatory Unit <br /> Central Valley - Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Subject: Proposed Remediation Workplan <br /> 2130 West Washington Street, Stockton <br /> Siema Pacific Project Number 10-92-033 <br /> Dear Ms. Wyels: <br /> Sierra-Pacific Groundwater Consultants, Inc. (Sierra-Pacific), under contract with Unocal <br /> Corporation, has prepared a four-part workplan to initiate remediation work at Cargill's (formerly <br /> PM AG Products) feed product facility,which is located at 2130 West Washington Street, Port of <br /> Stockton . Sierra-Pacific is prepared to begin soil sampling in the concrete driveway and west tank <br /> farm areas of the facility within one week of CV-RWQCB approval to start. <br /> A copy of the composite workplan is enclosed for;your consideration. Please call me if you have <br /> any questions, directives, or need additional information. <br /> Sincerely, <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> n Step en Rapp, CEG-1133 <br /> Senior Engineering Geologist <br /> Enclosure <br /> cc. Nick Nickerson, Unocal <br /> Mike Infurna, San Joaquin County <br /> Charlene Wall, Port of Stockton <br /> Jack Holm, Cargill Mollasses <br /> Dale Matthews, PM.AG Products <br /> (916)933-1468 <br /> 4911 Windplay Drive, Suite.4 El Dorado Hills,California 95762 (916)933-3197 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.