My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2130
>
2900 - Site Mitigation Program
>
PR0008999
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2020 3:18:50 PM
Creation date
6/15/2020 2:59:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0008999
PE
2960
FACILITY_ID
FA0004519
FACILITY_NAME
UNOCAL/CERT
STREET_NUMBER
2130
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
2130 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra Pacific G uncl�ucz er€ 'onsultants, Inc. <br /> Y1 r HIDROGEOLOGISTS&GEOLOGISTS <br /> October 10, 1995 <br /> Wendy Wyels, Agricultural Regulatory Unit <br /> Central Valley - Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California' 95827-3098 <br /> Subject. Monitoring Well (MW-5) Decommissioning Report, 2130 West Washington Street Site, <br /> Stockton, Sierra-Pacific Project No. 95=119.01 <br /> Dear Ms. Wyels: <br /> A copy of the well (MW-5) decommissioning report is enclosed for your consideration. The well <br /> was grouted with a bentonite/cement slurry on August 25, 1994 without complications. Wayne <br /> Woodward Drilling, Rio Vista, was the drilling contractor. Mike Infurna (San Joaquin County) <br /> handled the permitting and oversight. Cargill, Inc.i has subsequently requested that Sierra-Pacific <br /> replace MW-5, and I believe that it would be prudent to wait until Cargil has finished building <br /> roads, placing concrete, and installing tanks before a new up-gradient well is installed. Weather <br /> will not be a problem for installation. <br /> Please call me if you have questions. <br /> Sincerely, <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> J hn ejVCE <br /> -11 <br /> Se forring Geologist <br /> JSR/jb <br /> Enclosure <br /> C. Jack Holm, Cargill, Inc. <br /> W.T. Nickerson, Unocal <br /> Michael Infurna;Sari-Joaquin-County <br /> Charlene Wall, Port of-Stockton-----, <br /> 1 <br /> i <br /> (916)933-1468 <br /> 4911 Windplay Drive.Suite 4 EI Dorado Hill:.California 95762 (916)933-3197 FAX <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.