Laserfiche WebLink
Work Plan For Monitoring Well(MW-8)Installation <br /> 2130 West Washington Street Facility <br /> Stockton,California <br /> Sierra-Pacific Project No.95-119.02 <br /> r 6.0 REMARKS AND SIGNATURES <br /> L <br /> The approach used in this work plan represents our professional judgement and opinions. <br /> These opinions are based on currently available client information, and were developed in <br /> L accordance with currently accepted hydrogeologic and engineering practices. Other than this, <br /> no warranty is implied or intended. <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> This work plan was prepared by: <br /> r Joh Ste hen app, E -1133 Date <br /> L <br /> Seni&r Ehgineering Geologist <br /> This work plan was reviewed by: <br /> John Giorgi, REA V Date <br /> Senior Geologist <br /> L <br /> REV 7/12-1-95/PLAN 119BJSR/JLB <br /> Sierra-Pacific Groundwater Consultants <br />