Laserfiche WebLink
C. The percolation tests are to be conducted and the above <br /> conditions are to be met prior to the recordation of the <br /> Final Map. <br /> 3 . PACIFIC GAS AND ELECTRIC COMPANY: <br /> Conditions of Approval: <br /> a. The 25-foot-wide access road shall be dedicated as a <br /> public utility easement. <br /> b. Ten-foot-wide public utility easements shall be dedicated <br /> on all street frontages and shall be shown on the Final <br /> Map. <br /> 4 . PLANNING DIVISION: <br /> Conditions of Approval: <br /> a. All dwellings shall be constructed on the high ground of <br /> each parcel or have finished floor elevations 18 inches <br /> above the natural ground elevation. <br /> NOTE: On September 1, 1987, the San Joaquin County Board of <br /> Superevisors approved SU-87-24 subject to the Conditions <br /> of Approval listed above. <br /> Conditions of Approval - 3 - (SU-87-24) <br />