08 May 2019 AdvancedGeo <br /> AGE Project No. 15-3508 Environmental <br /> Page 5 of 5 <br /> 5.2. SEISMIC ANCHORING <br /> AST seismic anchoring includes a total of three 6-inch by 3.25-inch by 0.25-inch steel <br /> plates bolted approximately 3.5-inches into the concrete slab which the tank rests on. <br /> Each steel plate is bolted to the forklift "feet" which are welded onto the tank. <br /> Additionally, the AST is surrounded on the east and south sides by wooden walls located <br /> within the warehouse maintenance shop. The AST is shown in Figure 3. <br /> 5.3. INTEGRITY TEST FINDINGS <br /> Based on the calculations discussed in Section 5.1., the AST has sufficient integrity for <br /> its intended use. The total seismic load of the tank is calculated at 2,000 lbs. when empty <br /> and 7,920 lbs. when full. <br /> 6.0. DISCREPANCIES AND NON-COMPLIANT ISSUES <br /> The tank was observed without a visual and audible overfill alarm system. No other <br /> discrepancies or fixes were found during the inspection and AST assessment conducted <br /> by AGE representatives on 29 January 2019. <br /> 7.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar localities. The findings <br /> were based upon results provided by an independent subcontractor. Evaluation of the <br /> conditions at the site for the purpose of this investigation was made from a limited number <br /> of available data points (field measurements) and conditions may vary away from these <br /> data points. No other warranty, expressed or implied, is made as to the professional <br /> interpretations, opinions and recommendations contained in this report. <br />