My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
900
>
2200 - Hazardous Waste Program
>
PR0513643
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2020 10:32:48 PM
Creation date
6/16/2020 9:51:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0513643
PE
2227
FACILITY_ID
FA0003769
FACILITY_NAME
TERESI TRUCKING LLC
STREET_NUMBER
900
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905026
CURRENT_STATUS
01
SITE_LOCATION
900 1/2 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 May 2019 AdvancedGeo <br /> AGE Project No. 15-3508 Environmental <br /> Page 4 of 5 <br /> 4.2. TEST RESULTS <br /> The hydrostatic test results indicated both the primary and secondary AST shells did not <br /> leak at the time of the test. Pressure readings were collected every five minutes for one <br /> hour. No fluctuation in pressure was recorded during the test. Test results are provided <br /> in Table 4. <br /> 5.0. SEISMIC ANALYSIS <br /> A seismic analysis was provided to verify the AST will not tip or turn over during a seismic <br /> event. Seismic data used in the calculation is included in Table 2. The calculations are <br /> included as Appendix A. <br /> 5.1. CALCULATION <br /> Seismic analysis is calculated by using AST specifications and finding the horizontal <br /> shear, the overturn moment and the safety factor the AST will withstand during a seismic <br /> event. Seismic data used in the calculation is included as Table 2. The calculations are <br /> included as Appendix A. <br /> 5.1.1. Tank Specifications <br /> The 800-gallon AST primary and secondary compartments are manufactured from <br /> 10-gauge steel with a standard 1/8-inches in thickness, 72-inches in width, 48-inches in <br /> length and height of 61-inches. Superior Tanks (manufacturer) indicated that the tank <br /> weighs approximately 2,000 pounds (lbs.) when empty. Waste oil is temporarily stored <br /> within the tank. 800-gallons of waste oil weighs approximately 5,920 lbs. The total seismic <br /> load of the tank is calculated to be 2,000 lbs. when empty and 7,920 lbs. when full. <br /> 5.1.2. Calculation Results <br /> The pounds of horizontal shear are calculated at approximately 504 pounds force (Ibf). <br /> The tank overturn moment is calculated at approximately -4,719-pound force foot (Ibf ft). <br /> The safety factor was calculated at approximately 4.7. The tank without additional <br /> components is sufficient to not spill during a potential seismic event for this area. Figure 3 <br /> shows the AST top and east side with dimensions. The seismic calculations are included <br /> as Appendix A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.