My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0009016
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 1:25:11 PM
Creation date
6/17/2020 11:32:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009016
PE
2959
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
01
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/22/2002 16: 10 2094EM AGE STOCKTON PAGE 02 <br /> 07 May 2002 <br /> AGE-NC Project No. 98-0466 <br /> Page 10 of 16 <br /> 4.0. SCOPE Ok'WORK <br /> The scope of work for this site assessment includes: <br /> • Pre-field permitting; <br /> • Preparation of a health and safety plan; <br /> • Advancement of eight soil borings at various locations on the site indeatified as potential <br /> sources for subsurface contanvnation. Soil borings will be u ed for collection of soil <br /> and/or `grab' ground water samples. <br /> • Laboratory analysis of the ground water samples and selected so' samples; <br /> • Preparation of a report of findings; and <br /> • Preparation of a Health Risk Assessment based on the findings f the proposed scope of <br /> work. <br /> 4.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES <br /> Prior to conducting field activities, applicable site assessment permits ill be obtained from the <br /> EHD. In addition,an updated,site-specific health and safety plan will be pr-.pared in accordance with <br /> Occupational Safety and Health Guidance Manual for Hazardous Wast Site Activities (National. <br /> Institute for Occupational Safety and Health Administration, U.S. Coast Guard and U.S. <br /> Environmental Protection Agency, 1985). Prior to mobilization, the pror osed excavation area and <br /> soil boring location will be clearly marked and an underground utility clearance will be obtained <br /> through Underground Service Alert. <br /> 4.2. SOIL BORINGS <br /> AGE proposes to advanced eight probe borings for collection of soil d/or `grab' ground water <br /> samples at various locations identified at possible sources for subs ce contamination. Probe <br /> boring willbe advanced utilizing a hollow-stem auger drill rig and"direct-�ush"techniques. Borings <br /> will be advanced as followings: <br /> • One soil boring north of the north storm water basin and north pit for collection of a <br /> `grab' ground water sample to delineate the extent of metals-imp ed ground water in the <br /> area; <br /> • Two soil borings north of the Millwork Building for collection ¢f soil and `grab' ground <br /> water samples to delineate the extent of TPH-impacted ground ater; <br /> Advanced Geo&nvironmant&4 Hu- <br />
The URL can be used to link to this page
Your browser does not support the video tag.