Laserfiche WebLink
AOC Work Plans <br /> Factory fire pond and the Saw Filing Room and have since been removed ind properly disposed. <br /> The four transformers associated with the Millwork Building remain in use and are in good <br /> condition with no indications of releases. There are two transformers classified as non-PCB <br /> containing currently stored near the west-northwest corner of the"1940"Wilding(Plate 1.2). <br /> These two transformers are scheduled to be recycled. <br /> Previous Investigations <br /> The contents of the transformers currently stored at the"1940"building w= sampled by Electro- <br /> Test,Inc in the early 1980's and the fluid was certified to contain less thar 50 parts per million <br /> (ppm)PCBs classifying the transformers as non PCB containing transfern ers. <br /> Data Gaps <br /> On the basis of the previous sampling events and prior discussions with A VIMC personnel,it is our <br /> opinion that there are no data gaps for the PCB-containing transformers. a four transformers <br /> currently in use at the Millwork Building were observed to be in good con dition with no <br /> indications of releases. The remaining two transformers currently stored r ear the west-northwest <br /> comer of the"1940"building are classified as non PCB containing transformers and scheduled to <br /> be recycled. <br /> Draft <br /> KB61125workplan-ESC MACTEC Engineering and Consulting, Inc. 28 <br /> September 28,2005 <br />