Laserfiche WebLink
AOC Work Plans <br /> metals. One sample will be collected within 10 feet of the basin inlet;the remaining sample <br /> will be collected at least 10 feet from the basin edge. <br /> • South and Central Storm Water Basins—One surface water sample(if present)and two <br /> sediment samples will be collected from the South and Central Storm Water Basins and <br /> analyzed for VOCs, SVOCs,phenols, formaldehyde,TPHd, TPHmo, and metals. The surface <br /> water sample will be collected at the basin inlet. One sediment sample will be collected within <br /> 10 feet of the basin inlet; the remaining sample will be collected at least 10 feet from the basin <br /> edge. <br /> Draft <br /> KB61125 workplan-BSC MACTEC Engineering and Consulting, Inc. 49 <br /> September 28,2005 <br />