Laserfiche WebLink
29 January 2002 <br /> ' AGE-NC Project No. 98-0466 <br /> Page 17 of 25 <br /> ' • VOCs in accordance with EPA Method 8260; <br /> • Phenols in accordance with EPA Method 604/8040; and <br /> ' • Formaldehyde in acccordance with EPA Method 8315. <br /> The ground water sample collected from soil boring PB9 was analyzed or: <br /> • TPH-g, TPH-d and TPH-mo in accordance with EPA Method 8 015 Modified; <br /> ' • SVOCs in accordance with EPA Method 8270; <br /> • VOCS in accordance with EPA Method 8260; <br /> ' • Dissolved chromium copper, lead, nickle and zinc in accordant with EPA Method 200.7; <br /> • Formaldehyde in acccordance with EPA Method 8315; and <br /> • Total arsenic by EPA Method 206.2. <br /> The ground water sample collected from soil boring PB 10 was analyze for: <br /> • TPH-g, TPH-d and TPH-mo in accordance with EPA Method E 015 Modified; and <br /> ' • Formaldehyde in acccordance with EPA Method 8315. <br /> ' The groundwater samples collected from soil borings P131 I and PB 12 ere analyzed for: <br /> • TPH-g, TPH-d and TPH-mo in accordance with EPA Method 015 Modified; <br /> • SVOCs in accordance with EPA Method 8270; <br /> ' VOCs in accordance with EPA Method 8260; <br /> • Dissolved chromium, copper, lead, nickel and zinc in accordan e with EPA Method 200.7; <br /> and <br /> ' Formaldehyde in acccordance with EPA Method 8315. <br /> ' 3.6. EQUIPMENT DECONTAMINATION <br /> ' Prior to sample collection, hand auger and soil sampling equipment ere thoroughly rinsed with <br /> • clean water after washing with a solution of Alconox. The hollow-s em augers were thoroughly <br /> ' steam cleaned prior to soil boring advancement. <br /> Advanced GwEnvitonmentsl,Ine. <br />