My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:24:27 PM
Creation date
6/17/2020 1:28:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxridge Drive/P.O. Bax 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 <br /> THOMAS P. KROEHLE <br /> President <br /> September 6, 1988 <br /> Mr. Charles White, P.E. , Chief <br /> Permitting Unit <br /> Northern California Section <br /> Toxic Substances Control Division NIL, PSTb1 <br /> 4250 Power Inn Road /S <br /> DearSacramento, California 95826 1L� ""r <br /> Dear Mr. White: <br /> We appreciate your organization of and participation in our meeting of <br /> August 24, 1988, to discuss the .permanent closing of the pond at our <br /> Stockton facility. This letter includes the information regarding <br /> data to be submitted, preparation of the pond for winter, and our <br /> schedule for delivering the revised Closure Plan to your office. <br /> Data To Be Supplied- <br /> 1. Final Engineering and Environmental Analysis Report. A <br /> final analysis report will be submitted to present current <br /> site characterization information and the updated evaluation <br /> of closure alternatives. The report will include: <br /> - Arsenic data as described in Items 2 and 3. <br /> Waste Extraction Test data (leachability tests on <br /> sediments as described in Item 4) . <br /> - Soil physical characteristics data as described in <br /> Item 5. <br /> - Estimates of the total quantities of wood treating <br /> chemicals in the pond. <br /> - Cost breakdowns for the evaluated alternatives. <br /> - An expanded assessment of the risk reductions offered <br /> by each of the evaluated alternatives. <br /> MARL A <br /> I' <br /> the <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.