My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:24:27 PM
Creation date
6/17/2020 1:28:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE MARLEY COOLING TOWER COMPANY <br /> 5800 Foxnage Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 Q ( <br /> September 2, 1987 <br /> Mr. Jim Aust eng <br /> De artmen of alth ServsTostances <br /> trol <br /> 4410 Power Inn Road <br /> Sacramento, California 95826 <br /> RE: Progress Report-Stockton Assessment Program <br /> Dear Mr. Austreng: <br /> This report summarizes the activities at the Stockton facility <br /> from July 1, 1987 to August 15 , 1987 . <br /> I• Pond Closure <br /> A. Construction - the water treatment plant is <br /> substantially complete. <br /> B. Training and Start-Up - Formal training was <br /> completed week of July 27 . The "hands-on" <br /> training has been continuing since then. <br /> C. Pond Water Removal - The coagulation and <br /> settling of the silt from the pond water was <br /> effective. First trial run was about August <br /> 3rd. Water was withdrawn from pond, treated, <br /> sample taken and water returned to the pond. <br /> The analysis has shown the above limit of <br /> arsenic is coming through the ion exchanger. <br /> Test have continued, using different variation <br /> in the exchanger to remove the arsenic and not <br /> effect the copper and chrome removal. To date <br /> no water has been discharged to the diverting <br /> canal . <br /> IT . Ground Water Assessment <br /> A. Aquifer Test - The aquifer test was completed <br /> week of July 20 , 1987 . Hargis is now in process <br /> MARLEY <br /> A MARLEY COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.