My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1987
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:24:27 PM
Creation date
6/17/2020 1:28:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1987
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 Cont. <br /> of reviewing the data and developing our ex- <br /> traction plan. <br /> B. NPDES Permit - The hearing for the permit has <br /> been rescheduled for September 25 board meeting. <br /> C. Quarterly Samples - Results of the July monitoring <br /> tests are attached. <br /> III . Soil Samples - South Yard Ditches - The review of <br /> the draft of the report has not been completed <br /> because of other activities . It is anticipated <br /> that review will now be completed before September <br /> 1 and returned to Kleinfelder for release. <br /> IV. Domestic Water Well Tests - Domestic wells and <br /> California Water Service Well #20 were sampled week <br /> of July 6 . Results are attached. The well reported <br /> to be at 328 N. Lillian has been out of service since <br /> 1973 . <br /> V. Work Plan - Comments have been received from the DHS <br /> on work plan, Jim Austreng' s letter of August 1, <br /> 1987 . These comments will be included in next <br /> revision of the work plan. A work plan for off- <br /> site sampling will be submitted as soon as possible <br /> but some extension to the 30 days has been requested. <br /> VI . Schedule - Revised schedule is attached. <br /> Please advise if you have any questions . <br /> Sincerely, <br /> THE MARLEY COOLING TOWER COMPANY <br /> (::�)0_j L").Q � <br /> David W. Bates <br /> Chief Production Engineer <br /> DWB/jel <br /> Attachment <br />
The URL can be used to link to this page
Your browser does not support the video tag.