My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 2:56:59 PM
Creation date
6/17/2020 1:34:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1990
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
02
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BLACKqW <br /> & VEATCH <br /> ENGINEERS-ARCHITECTS TEL. (913) 339-2000 <br /> 1500 MEADOW LAKE PARKWAY <br /> MAILING ADDRESS PO. BOX NO.8405 <br /> KANSAS CITY. MISSOURI 64114 <br /> Marley Cooling Tower Company B&V Project 11654.652 <br /> Stockton, California Facility November 30, 1990 <br /> Subsurface Soil Flushing System <br /> Mr. Jim Austreng <br /> Department of Health Services DEC <br /> Toxic Substances Control Program L'VV{R0,v <br /> 10151 Croydon Way pER�, EA,rll <br /> Sacramento, CA 95827-2106 r/moi <br /> Dear Mr. Austreng: <br /> On behalf of the Marley Cooling Tower Company, I have enclosed four <br /> copies of each of the following submittal documents for the design of <br /> the Subsurface Soil Flushing System: <br /> 1. Operating Description and Sampling and Monitoring Plan. <br /> 2. Construction Specifications. <br /> 3. Civil Design Drawings. <br /> Additional design and implementation documents are currently being <br /> prepared by Black & Veatch and will be forwarded to you upon completion. <br /> These design documents include a Health and Safety Plan for system <br /> construction, complete electrical details, and additional civil details. <br /> Two major factors need to be considered in reviewing the project <br /> documents. <br /> 1. The remedial action will be implemented in four phases: <br /> Pilot System Construction, Pilot Study, Full-Scale <br /> Construction, and Long-Term Flushing. <br /> The Pilot System Construction will consist of installation of <br /> two injection wells and additional monitoring devices. The <br /> pilot flushing system will then be operated and monitored for <br /> approximately two months. At the conclusion of this phase, <br /> modifications in the final construction efforts will be <br /> defined as necessary. After construction of the full-scale <br /> flushing system, flushing will be operated until an apparent <br /> steady state condition has been reached and there is no <br /> decrease in hexavalent chromium concentrations with continued <br /> flushing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.