Laserfiche WebLink
MONITORING AND REPORT PROGRAM NO. R5-2003-XXXX 5 <br /> SPX CORPORATION <br /> MARLEY COOLING TOWER COMPANY <br /> SAN JOAQUIN COUNTY <br /> Dilution Series: Dilutions (%) Controls <br /> 100 50 25 12.5 6.25 <br /> SDC Lab <br /> Water Water <br /> % GWTP Effluent 100 50 25 12.5 6.25 0 0 <br /> %Dilution Water* 0 50 75 87.5 93.75 100 0 <br /> %Lab Water 0 0 0 0 0 0 100 <br /> * Dilution water shall be receiving water from Stockton Diverting Canal taken upstream from the <br /> discharge point. <br /> REPORTING <br /> Monitoring reports shall be submitted to the Regional Board by the first day of the second month <br /> following sample collection. Semi-annual and annual monitoring results shall be submitted by the first <br /> day of the second month following each calendar semi-annual period, and year, respectively. <br /> In reporting the monitoring data, the Discharger shall arrange the data in tabular form so that the date, <br /> the constituents, and the concentrations are readily discernible. The data shall be summarized in such a <br /> manner to illustrate clearly whether the discharge complies with waste discharge requirements. The <br /> highest daily maximum for the month, monthly and weekly averages, and medians, and should be <br /> determined and recorded. <br /> If the Discharger monitors any pollutant at the locations designated herein more frequently than is <br /> required by this Order, the results of such monitoring shall be included in the calculation and reporting <br /> of the values required in the discharge monitoring report form. Such increased frequency shall be <br /> indicated on the discharge monitoring report form. <br /> By 1 February of each year, the Discharger shall submit a written report to the Executive Officer <br /> containing the following: <br /> a. The names and telephone numbers of persons to contact regarding the plant for emergency and <br /> routine situations. <br /> b. A statement certifying when the flow meter and other monitoring instruments and devices were <br /> last calibrated, including identification of who performed the calibration (Standard Provision <br /> C.6). <br /> c. A statement certifying whether the current operation and maintenance manual, and contingency <br /> plan, reflect the groundwater treatment plant as currently constructed and operated, and the <br /> dates when these documents were last revised and last reviewed for accuracy. <br /> The Discharger may also be requested to submit an annual report to the Board with both tabular and <br /> graphical summaries of the monitoring data obtained during the previous year. Any such request shall <br />