My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2020 4:01:50 PM
Creation date
6/17/2020 3:15:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> : of <br /> Chronology Page 4 <br /> 2801 West Lane, Stockton <br /> 02/18/05 Date of Additional 1,2-DCA Investigation and Site Conceptual Model and Second <br /> Quarter 2004 Groundwater Monitoring Report which includes a discussion of the work <br /> done on 3/4/04 and a request for site clos re. <br /> 05/05/05 Date of the EHD letter in response to dditional 1,2-DCA Investigation and Site <br /> Conceptual Model and Second Quarter 2004 Groundwater Monitoring Report again <br /> denying URS's request for site closure because the 1,2-DCA plume was not defined. <br /> 07/07/05 Borings HP-9 and HP-10 were drilled on this date. <br /> 09/01/05 Borings HP-11 and HP-12 were drilled on this date. <br /> 02/15/06 Date of No Further Action Request (NFAR letter discusses the work done during July <br /> and September 2005 and recommends site closure based on declining trends of 1,2- <br /> DCA. <br /> 02/09/07 A Notice of Responsibility (NOR) was ma led to MCD Lazares Stockton LLC, a new <br /> property owner, on this date. <br /> 03/08/07 Date of the EHD letter regarding the No FurtherAction Request (NFAR) dated 2115106 <br /> in which the EHD required submittal of an updated Site Conceptual Model and a work <br /> plan for additional site assessment for 1,2- CA. <br /> 0417-10/08 Monitoring wells DMW-11 though DMW-14 were installed during this time. j <br /> 07/31/08 Date of Well Installation Report Monitoring Wells DMW-90, DMW-11, DMW-92, DMW- <br /> 13, and DMW-14 that discusses the April 2008 work and recommends site closure. i <br /> 10/23/08 Date of the EHD letter in response to the Well Installation Report Monitoring Wells <br /> DMW-10, DMW-11, DMW-92, DMW-13, ar7d DMW-14 in which the EHD required a <br /> few more sampling events to confirm the downward trends of 1,2-DCA. <br /> 07/19/08 Date of transfer of property ownership to the San Joaquin Regional Rail Commission. <br /> 04/20/09 Date of First Quarter 2009 Monitoring Report in which URS concludes that four more <br /> quarters of groundwater results demonstratea downward trend for 1,2-DCA. <br /> 07/24/09 Date of Closure Summary Report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.