My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 9:27:06 AM
Creation date
6/18/2020 9:11:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for 99 SHELL* as of April 27, 2020. <br /> Open violations from August 29, 2019 inspection <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #204 -Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times. Immediately locate and retain a copy on site. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation #205 -Failure to submit a current UST Response Plan and have it available onsite. <br /> An approved copy of the response plan was not available for inspection. A copy of this plan shall be accessible on <br /> site at all times. Immediately locate and retain a copy on site. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.