My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:27:37 AM
Creation date
6/18/2020 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTS7-%STS <br /> ,''1�� <br /> �+l X19�l J <br /> - p Y . <br /> Franklin Fueling Systems 0" tdle- <br /> TS-STS <br /> Ick Stott G'Overview VS-STS Installation <br /> The TS-STS system includes a TS-STS console within a convenient (D <br /> portable case,leak testinq probes with 50 feet of cable,and probe 1.) Required Materials: <br /> hanging hardware(slip rings and chain). a.) Tape to secure the probe cable b.) Safety cones& signs <br /> After all fittings within the sump are sealed,the sump is filled with a c.) Grounded,3-pronged extension cord <br /> water-based test solution that covers all sump penetration holes.The <br /> probe is installed so the float is floating on the surface of the test solution. d.) Flat pieces of metal to suspend leak testing probe over sumps <br /> The TS-STS console is quickly programmed with the site name and 2.) Work safely—install Safety Cones and Signs at the site <br /> address,number of sumps,the 7-digit code-names for each sump,and <br /> the correct Time/Day/Date before leak testing. 3.) The probes are precision instruments—handle with care! <br /> Precoing the Tect key at tho concolo koypad ctarte sump leak tests for 4.) The STS probes are shIppPriwith rahlas attachP.d,rin nol rernove. <br /> all sumps.The test time is 15 minutes and tests for a level change the cable from the probe end...remove at the console case only. <br /> greater than 0.002 inches. If the level of a sump drops more than the 5.) Inspect probes for proper float movement before use,then install <br /> leak limit during the test,the.Sump I Pak Test Report will show a fail probes as shown in Section 1 <br /> result when the test is finished. Leak tests can also be programmed <br /> (scheduled)to start at desired times. 6.) Connect the yellow probe cables to the receptacles at the TS-STS <br /> When finished,leak test reports will automatically print out at the console case. Make sure to line tip keyways before inserting cable and <br /> printer.Extra copies of this report can be printed using the report key.A <br /> tightening the screw-on connector. <br /> newly completed Sump Leak Test will overwrite the previous results 7.) Locate the TS-STS case outside of the Hazardous Area and tape <br /> stored in memory. Save sump leak test reports and provide copies as the cable down to prevent probe movement during the.test and to <br /> evidence of compliance with regulations. reduce tripping hazards <br /> Recommendation: Use a computer and the Tech version of 8.) Setup/Program the TS-STS console per Section 2 <br /> System SentinelT"'to record site data,sump code-names,and test <br /> results.Test results can also be extracted from Comm Port 1 at 9•) Start sump leak test(s)on sumps that are ready <br /> NATE the bottom of the TS-STS console (also see section 4). 10.) Always clean,dry,and store probes in the probe carrying case after <br /> Reference Federal and Slate regulations for leak limit and test each use <br /> time requirements. Recommendations for locating the TS-STS <br /> console outside of the(Class 1,Division 1,Group D)Hazardous Areas 11.) Test each of the probes on a monthly basis to ensure its ability to <br /> during testing,are based on NFPA 30,NFPA 30A and NFPA 70(NEC). detect leaks,Install the probe in a test container and initiate a test. <br /> After 5 minutes,remove about 0.12 inches of water.When the test <br /> INCON P/N 000.30D4Rev.D Feb.2009 0 com completes,the test report should show a Failed result if the probe <br /> -rhis document may change without prior notice. INCOW Is a Registered Trademark of Franklin Fueling Systems is working properly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.