My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PICCOLI
>
1990
>
2300 - Underground Storage Tank Program
>
PR0231820
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 9:27:37 AM
Creation date
6/18/2020 9:46:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231820
PE
2361
FACILITY_ID
FA0003826
FACILITY_NAME
Supervalu
STREET_NUMBER
1990
Direction
N
STREET_NAME
PICCOLI
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
10121001
CURRENT_STATUS
01
SITE_LOCATION
1990 N PICCOLI RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• O Pg 2 <br /> rol <br /> DISPENSER DISPENSER DISPENSER DISPENSER Op <br /> 112 314 516 716 <br /> FLAT UIRED <br /> 1ANGLEIRON <br /> REQUIRED <br /> TO SUSPEND <br /> PROBE RECEPTACLES <br /> (SIDE VIEW( sump FOR FOUR <br /> OQ s SCREW-IN,PROBE <br /> f o CABLE PLUGS <br /> ®�p�p�p. to POWER CORD <br /> WITH A GROUNDED <br /> I�r©= r t f 3-PRONGED <br /> — ❑ PLUG <br /> 20 Feel-Min.Distance \ <br /> Per NFPA 30A Qp <br /> TS-STS <br /> Op 1 _SUMP TEST SYSTEM <br /> 0 0 0 <br /> O SPLIT RING <br /> O SAFETY 1 <br /> CONES ` f <br /> g TESTING E <br /> NGE ISP NSOR <br /> c SUMPS IN GROUPS STS-PRO-12 <br /> SO OTHER DISPENSORS LEAH TESTING <br /> GROUNDED ARE LEFT IN SERVICE PROBE WITH: <br /> 3 PRONG DURING TESTING _ TSP-SSP <br /> EXTENSIONSTAINLESS <br /> rssrs `i — STEEL FLOAT <br /> S ulresrrruc CORD REO'D <br /> DISPENSER SUMP <br /> WITH TEST SOLUTION <br /> BUILDING = (Side View) <br /> Figure 1.1 Typical Leak Detection Probe—Dispenser Sump Installation Figure l.2 Leak Detection Probe Installation <br /> Overview Dispenser Sump <br />
The URL can be used to link to this page
Your browser does not support the video tag.