Laserfiche WebLink
COr---- ----] 1 P83 <br /> OTurbiOTnO <br /> Turbine neutbe <br /> r T <br /> I Sump Sul p Su3 p I FIAT METAL <br /> OO /ANGLEIRON <br /> . 1 REOUIREO <br /> r O TO SUSPEND <br /> I i PROBE ° <br /> (SIDE VIEY>f <br /> s r RECEPTACLES <br /> r I / buu4FOR FOUR <br /> o <br /> SCREW-IN,PROBE <br /> IE-- t <br /> �o CABLE PLUGS <br /> o <br /> O I Tank Pad 0 0 l O (�� �•® <br /> �--- -- -- -- -- � IPJ <br /> TAPE/WEIGHT DOWN r� —®— <br /> CABLE TO PREVENT <br /> OO 10 Feel-Min.Olslance ACCIDENTAL <br /> Per Min.FPA 30A MOVEMENT DURING <br /> LEAK TESTING TS-STS <br /> T (PROBE CABLE SUMP TEST SYSTEM <br /> LT <br /> PN:6000200 SPLIT RING \ <br /> 50 FEET) / POWER CORD <br /> WITH A GROUNDED <br /> SAFETY 3•PRONGED <br /> CONES ` FT <br /> PLUG <br /> GROUNDED 3PRONG ®EXTENSION a <br /> CORD REQ'D <br /> It sts <br /> wur rest srsrcu <br /> TURBINE SUMP <br /> STP WITH TEST SOLUTION <br /> (Side View) <br /> BUILDING <br /> Figure 1.3 Typical Leak Detection Probe—Turbine Sump Installation Figure L4 Leak Detection Probe Installation <br /> Overview Turbine Sump <br />