My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007950
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0007950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:49:14 PM
Creation date
6/18/2020 12:06:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007950
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 FIELD AND LABORATORY PROCEDURES <br /> This section provides a summary of the field and laboratory procedures used during the first <br /> quarter 2000 monitoring event <br /> 2 1 Sampling Methods And Procedures <br /> Groundwater samples were collected by Dames & Moore on February 28, 2000 Field <br /> records of sampling are attached in Appendix A Prior to sampling, the static water level <br /> was measured at monitoring wells DMW-1 through DMW-7 using an electric water level <br /> indicator All seven monitoring wells were sampled <br /> Groundwater sampling was conducted in accordance with procedures described in the <br /> Work Plan dated September 14, 1998 The sampled monitoring wells were purged using a <br />' submersible pump, which was steam cleaned prior to use The wells were purged until a <br /> minimum of three casing volumes were removed from each well, and until the <br /> Ifield-measured temperature, pH, and specific conductivity stabilized Purged groundwater <br /> was temporarily stored in a polyethylene holding tank: The wastewater was disposed into <br /> the American Molding and Mill Works sanitary se,.ver system in accordance with the <br /> Special Permit for Wastewater Discharge P 106 984 104, issued by the City of Stockton on <br /> March 10, 1999 <br /> Water samples were collected using disposable polyethylene bailers A new bailer was <br /> used at each well One duplicate groundwater sample (MW-70) was collected at DMW-7 <br /> The duplicate sample was collected in the same manner as the primary sample, following <br /> collection of the primary sample <br /> "Certified clean" one liter glass sample container,, supplied by the laboratory, were used <br /> during the collection of groundwater samples The samples were placed on ice <br /> immediately following collection, and kept in coolers until delivery to laboratory <br /> 2.2 Laboratory Procedures <br /> Groundwater samples were analyzed by STL, Inc located in West Sacramento, California <br /> The samples were analyzed for TPH-D using EPA Method 8015M with Northwest Cleanup <br /> Procedure, which was included to order to remove non-petroleum hydrocarbons Copies of <br />' the laboratory reports are attached in Appendix B <br /> Dames&Moore 4 }\AFPIREP0RTIQI-2000 floc <br />
The URL can be used to link to this page
Your browser does not support the video tag.