Laserfiche WebLink
June 5,1990 <br /> Tuesday <br /> Day # 2 <br /> Demo Work Begin demo work at 7 30 2 labors and cat and <br /> operator Remove corrugated metal siding and <br /> stockpile to sell as scrap Wood framing members <br /> of the building are broken and then driven over <br /> repeatedly by the track cat This turns the timber <br /> into a compact pile of splintered wood This <br /> reduces the volume of debris to be disposed <br /> Chemical Waste Management delivered chemical toilets Placed <br /> Toilets at excavation and bio—cell <br /> Photos Mr Pete Habebe of AM&K is on site photo <br /> documenting the demolition work He also said that <br /> Marvin Palmer wanted photos of building before demo <br /> work began, he was to late Returned at various <br /> times during the day to take additional photos <br /> Temporarily Set up a site office in NW corner of building 3 <br /> Office Informed Leo Carse D&M SFO of phone number AM&M <br /> Maintenance Supervisor Dave Christen gave me a key <br /> for the office Office will be large enough for on <br /> site lab set up Has 120 volt power and is air <br /> conditioned Sharing space with AM&M employee <br /> Steve Sockacki, maintenance electrician <br /> Fence Economy Fence delivered 500' of fence panels and <br /> stands Set fence along side building 3 <br />