Laserfiche WebLink
June 11,1990 <br /> Monday <br /> Day # 5 <br /> Biocell Area CKC arrived on site 11 30 AM Started to remove <br /> and replace damaged areas of the AC pavement we <br /> re <br /> the cell would be constructed I reviewed the work <br /> with CKC's owner Karl <br /> Eris Scove and George Chew of SFO office showed up <br /> Health and <br /> Safety <br /> around 2 30 I reviewed the work with both Eric <br /> set up a table in the office area were he could o <br /> the on site analytical testing of the soil <br /> Mobilize CKC begins to mobilize excavation and other <br /> equipment including a field office trailer <br />